Know this will get moved; but since the season is over and the cluster*ck in the Transfer Portal is mostly over, I'm crossing the lines and posting this here. In a day or two, it'll moved and that's OK.
Anyway, for the last 7 or 8 years, we've been bouncing around ideas for remodeling our kitchen. Had a contractor that remodeled the basement give us a bid but he retired sooner than we expected so we had to hunt for a new contractor.
I could not believe how many contractors would make appointments and then just not show up. Got on one guy's waiting list (like almost 2 years just to get him to come look at the job. I really liked that guy, he knew his stuff and I was comfortable with him. We decided to relook what we were doing (originally we were going to flip the kitchen and dining room with a nice island but I had concerns the existing dining room was just a smidge too small for that, plus it was a ton of money due to knocking out walls and honestly more kitchen than we need at this point in our lives.
We decided that it was best to leave the kitchen where it is, have the new cabinets extended to the ceiling and have a pantry constructed in a niche off the side door. So the contractor that I liked came over in August and we talked about our change, measured everything, had his cabinet guy over for a look see and everything seemed cool. I had a couple questions so I shot him an email in early October and never heard back. First of the year, I called and left a message and never received a response. I'm guessing that he's got other jobs waiting in the wings that are larger in scope and he will therefore make more money, so he's leaving us on the back burner for a time when he's not real busy. Wrong thing to do.
I was walking Missy early about 3 weeks ago and passed by a contractor getting out of his vehicle at a house several blocks away. I stopped and chatted with him. He gave me a business card and I emailed him that day. He called the next day to set up a time to visit the kitchen and also sent me a bunch of pictures of kitchens that he's remodeled. Came by to see the job and called yesterday to make an appointment to bring his cabinet guy as the cabinet guy wanted to take his own measurements (I thoroughly approved of that move).
He's got a couple of jobs ahead of us but expects to be have us started late March to early April. As long as his numbers aren't astronomical, by harvest time, I'll be processing my veggies in my newly remodeled kitchen. I'm so stoked that we are this far along in the process.
Still not official but I've got a good feeling about it all!!!
Anyway, for the last 7 or 8 years, we've been bouncing around ideas for remodeling our kitchen. Had a contractor that remodeled the basement give us a bid but he retired sooner than we expected so we had to hunt for a new contractor.
I could not believe how many contractors would make appointments and then just not show up. Got on one guy's waiting list (like almost 2 years just to get him to come look at the job. I really liked that guy, he knew his stuff and I was comfortable with him. We decided to relook what we were doing (originally we were going to flip the kitchen and dining room with a nice island but I had concerns the existing dining room was just a smidge too small for that, plus it was a ton of money due to knocking out walls and honestly more kitchen than we need at this point in our lives.
We decided that it was best to leave the kitchen where it is, have the new cabinets extended to the ceiling and have a pantry constructed in a niche off the side door. So the contractor that I liked came over in August and we talked about our change, measured everything, had his cabinet guy over for a look see and everything seemed cool. I had a couple questions so I shot him an email in early October and never heard back. First of the year, I called and left a message and never received a response. I'm guessing that he's got other jobs waiting in the wings that are larger in scope and he will therefore make more money, so he's leaving us on the back burner for a time when he's not real busy. Wrong thing to do.
I was walking Missy early about 3 weeks ago and passed by a contractor getting out of his vehicle at a house several blocks away. I stopped and chatted with him. He gave me a business card and I emailed him that day. He called the next day to set up a time to visit the kitchen and also sent me a bunch of pictures of kitchens that he's remodeled. Came by to see the job and called yesterday to make an appointment to bring his cabinet guy as the cabinet guy wanted to take his own measurements (I thoroughly approved of that move).
He's got a couple of jobs ahead of us but expects to be have us started late March to early April. As long as his numbers aren't astronomical, by harvest time, I'll be processing my veggies in my newly remodeled kitchen. I'm so stoked that we are this far along in the process.
Still not official but I've got a good feeling about it all!!!









